Program Evaluation and Review Technique

In the Program Evaluation and Review Technique (PERT), an optimistic, a probable, and a pessimistic time estimate are given for each event. This network method is designed as an event node network (EKN) and was developed in 1958 by the US Navy together with the companies Boots and Hamilton and Lockhead. (Source: Mehrmann/ Wirtz)