Risk identification

This first step of the risk analysis serves to identify the risks for the project. The work breakdown structure can be used as a tool to check all work packages for possible hazards. This can be differentiated into factual (technical), scheduling and financial risks. In this way, a list of expected risks is created with their assignment to the respective work package. (Source: GPM)

» Terms from A-Z